Horizontal Stab 2:00

I’ve heard that the secret to completing a large build like this is to spend at least 5 minutes a day in the shop. Well I have some lost time to make up. I lined up the hinge to connect the elevator to the horizontal stabilizer, clamped and drilled the holes. Then I spent a lot of time up-drilling the skin. That was a lot of holes and moving the clecos got tedious. I changed hands on the pliers many times. I’m well on my way to Popeye arms. I always think the skin looks cool when you put the #30 clecos in place and before you remove the #40 clecos. Right now I only have 200 #30 and 200 #40 clecos, and I’m using every one of them. I should really order more.

IMG_0614

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s